Business Central November 2026

30 | Fire safety key in science building upgrade A key focus was to boost passive fire-safety resilience, including features like fire doors, walls and ceilings. Victoria University of Wellington: Naylor Love - Laby Building T T Kim Newth REGIONAL DEVELOPMENT CLEARAir Asbes t os Managemen t L t d WELLINGTON’S TRUSTED EXPERTS ASBESTOS REMOVAL SERVICES. CLASS A & B ASBESTOS REMOVAL CONTAMINATED SOIL MOULD REMEDIATION Proudly Supporting Victoria University of Wellington 027 775 5005 info@clearair.co.nz clearair.co.nz YOUR TRUSTED PARTNER FOR COMMERCIAL EQUIPMENT HIRE Proudly Supporting Victoria University of Wellington Whether you’re tackling a construction project, maintaining a large facility, or managing a bustling commercial site, we have the right equipment hire solutions to meet your needs. ACCESS EQUIPMENT HIRE CONSTRUCTION EQUIPMENT HIRE COMPETITIVE RATES & EXCEPTIONAL SERVICE 021 197 8206 jamieo.resmanagement@gmail.com Science students, past and present, who have studied at Te Herenga Waka-Victoria University of Wellington’s Kelburn campus will be very familiar with the Laby Building, home to the School of Chemical and Physical Sciences. A year-long renewal project has modernised the 1982 building, bringing it into line with today’s compliance requirements. A key focus was to boost passive fire-safety resilience, including features like fire doors, walls and ceilings. Over the years, various changes had been made inside the six-storey building to accommodate evolving research needs. Sometimes, walls were moved, or new cables and pipes installed. These changes would have been consented to meet fire and building requirements at the time, but modern fire safety has since advanced considerably. “Over the decades, we have improved how to stop fire spreading in a building and can do a much better job of it now,” says project manager, Philip McKague, of the campus development team, property services. For example, tools like fire collars can be deployed on pipes. These will expand and fill a hole in a firewall in the event of a blaze, even if the pipe itself melts. Similarly, fire dampers and heat sensors can be installed in air ducting that will activate in the event of a fire. Fire engineers, council staff and Fire and Emergency New Zealand (FENZ) were all consulted as part of the remediation strategy for the Laby Building. Checking pipes and cables meant having to remove Gib walls in many areas. Much of the renewal project centred on the building’s four stairwells, with extensive scaffolding being used. “We did one stairwell at a time to give staff and students enough option,” Philip says. “Part of the work involved removing all the existing swing doors into the stairwells and replacing them with modern, solid-core fire doors. “ A significant amount of work was also done on the building’s level-three concrete floor, as horizontal fire separation, to make sure it was up to code.” The project’s main contractor, Naylor Love, has been putting together a three-dimensional model of the building to provide a single source of unified data moving forward. “It means engineers or council inspectors will be able to look at it, see how it’s constructed and what fire-stop solutions are in place. Having that three-dimensional model allows us to benchmark the building so that if there are any changes in future, we can record that too,” Philip says. This month, the project is reaching practical completion (November 11), 13 months after work started on-site at the end of September last year. “Naylor Love has been absolutely amazing. They have so much organisational capability – not just the team on the tools, but the whole support network of people behind them. They’ve truly got the best people. Their site manager, David Fenwick, is really proactive and so experienced in project delivery.” Philip says the communication between academic staff and the construction team has been exemplary, with a lot of work timed to take place after-hours, on weekends and public holidays to minimise disruption. “They’ve had a whole team of specialist trades working for them delivering portions of the work. Everyone has been pulling hard to get us a good result.”

RkJQdWJsaXNoZXIy NDc2Mzg=